Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add filters








Language
Year range
1.
Nucleus (La Habana) ; (64): 1-3, July.-Dec. 2018. tab, graf
Article in English | LILACS-Express | LILACS | ID: biblio-1002719

ABSTRACT

Abstract After the long shut-down, the LHC Run2 has started with new running conditions with respect to Run1: in particular the centre of mass energy has reached 13 TeV and the bunch-spacing is now 25 ns. In order to cope with these changes, the ATLAS luminosity monitor LUCID and its electronics have been completely rebuilt. This note describes the new detector and electronics, the new luminosity algorithms and the new calibration systems, with a brief review of the first results about the stability of the measurement and evaluation of systematic uncertainties for the 2015 data.


Resumen Después de una larga parada, el LHC Run2 comenzó con nuevas condiciones de funcionamiento con respecto al Run1: en particular, el centro de masa energía ha alcanzado los 13 TeV y el espaciamiento entre los grupos es de 25 ns. Para hacer frente a estos cambios, el monitor de luminosidad ATLAS LUCID y su electrónica se han reconstruido por completo. Esta nota describe el nuevo detector y la electrónica, los nuevos algoritmos de luminosidad y los nuevos sistemas de calibración, con una breve revisión de los primeros resultados sobre la estabilidad de la medición y evaluación de incertidumbres sistemáticas para la toma de datos de 2015.

SELECTION OF CITATIONS
SEARCH DETAIL